Open bids › Engineering, design and commissioning
Design Build Construction for Selective Improvement Project in Hong Kong Consulate – Sources Sought/Market Research
STATE, DEPARTMENT OF
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- Dec 1, 2026 (closes in 8 days)
- Posted
- Nov 17, 2026
- Type
- Sources sought
- Agency
- STATE, DEPARTMENT OF
- Solicitation number
- 19AQMM27RHongKongSIP
- NAICS
- 236220 · Nonresidential building construction
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
Department of State 2027 Design-Build Construction for Hong Kong Existing Consulate Compound (ECC) Selective Improvements Project (SIP) Sources Sought Market Research This is a Sources Sought Notice Only. This Sources Sought Notice is issued for information and planning purposes only as part of U.S. Department of State market research and does not constitute a Request for Proposals (RFP).
The purpose of this notice is to obtain information regarding the availability and capability of qualified businesses, with a special interest in Small Business (SB), Women-Owned Small Business (WOSB), Historically Underutilized Business Zone (HUBZone), 8(a), and Service-Disabled Veteran-Owned Small Business (SDVOSB) firms under NAICS code 236220, Commercial and Institutional Building Construction.
Be advised that acquisition strategy and set-aside decisions may be made based on the information provided in response to this Sources Sought Notice. The Government is requesting information regarding the availability of capable firms to support the requirements of the U.S. Department of State (DOS), Bureau of Overseas Buildings Operations (OBO) for a Design-Build (DB) construction contract at the existing U.S.
Read full notice
Consulate General compound in Hong Kong, S.A.R., China. Please note that a decision not to submit a response to this Sources Sought Notice will not preclude a vendor from participating in any future solicitation. The Government will not pay for information submitted in response to this Sources Sought Notice, nor will it compensate responders for any costs incurred in the development or furnishing of a response. 1.
Project Description – Hong Kong Existing Consulate Compound (ECC) Selective Improvements Project (SIP), Design-Build Construction TOP SECRET FACILITY AND PERSONNEL SECURITY CLEARANCES ARE REQUIRED.
A Defense Counterintelligence and Security Agency (DCSA) Top-Secret facility security clearance (FCL) with Secret safeguarding capability is required for this project, along with an OBO/SPC approved dedicated project space, OBO/DT-approved classified Information System (IS) and ProjNet-C for handling classified information up to the Secret level. Property Description: The project is located at the existing U.S.
Consulate General compound, 26 Garden Rd, Central, Hong Kong. The site comprises 1.42 acres in the Central Business District of Hong Kong and is bounded along its perimeter by Garden Rd, Lower Albert Rd, and Upper Albert Rd. The site is fully developed and occupied.
Background: The Design-Build solicitation will follow a bridging design effort (Task Order awarded to an A/E IDIQ contractor) that is developing concept, Design Intent 1 (DI-1), and Design Intent 2 (DI-2) design packages to support an eventual Design-Build Request for Proposal. Project Scope: The project will address deficiencies in life safety, infrastructure, and space utilization at the existing, occupied consulate compound.
Key scope elements may include: Provide code-compliant emergency egress and fire sprinkler piping Replace/add chillers and other mechanical infrastructure (air-handling units, Building Automation System) Upgrade electrical and telecommunications infrastructure Provide accessible pathways for all consular functions Improve space utilization Replace roof and repair minor structural deficiencies Important and Unique Considerations: This project requires phasing and logistics to maintain existing post operations with minimal disruption, as the compound must remain fully functional throughout construction.
The Design-Build offeror will be expected to develop a constructability analysis, phasing plan, and project execution schedule showing how work will be accomplished with limited swing space and very limited on-site storage/laydown area in an occupied, secure diplomatic facility.
Estimated Construction Cost & Contract Type: The design-build project is currently estimated to be between $65,000,000 - $95,000,000, representing the estimated constructi…
More open bids like this
-
Design Build (DB) Requirement for Land Port of Entry Modernization Project in Limestone, Maine
GENERAL SERVICES ADMINISTRATION -
Integrated Design Build Initial Outfitting (iDBIO) Multiple Award Task Order (MATOC) 6.0 Design Build (DB) Construction in Support of Defense Health Agency (DHA)
DEPT OF DEFENSE -
Y1JZ--Indefinite Delivery Indefinite Quantity (IDIQ) Design-Build & Construction Multiple Award Task Order Contract (MATOC) National VA Healthcare Construction Program
VETERANS AFFAIRS, DEPARTMENT OF -
NUWCDIVNPT-Construction-Vaporizer Enclosure (Design-Build)
DEPT OF DEFENSE -
Capitol Perimeter Enhancements (CPE) Design-Build Construction Project
DEPT OF DEFENSE