Open bids › Engineering, design and commissioning
Y--NAMA 326209 East Potomac Seawall Design Build
INTERIOR, DEPARTMENT OF THE
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- No close date published
- Posted
- Nov 13, 2026
- Type
- Presolicitation
- Agency
- INTERIOR, DEPARTMENT OF THE · DEPARTMENTAL OFFICES
- Solicitation number
- 140D0427RP001
- NAICS
- 237990 · Other heavy and civil engineering construction
- PSC
- Y1PZ
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
The Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD) on behalf of the National Park Service (NPS) intends to issue a solicitation to interested businesses with the capability to perform the work described below. Interested parties must maintain an active SAM registration. The procurement will be solicited on an unrestricted basis.
This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation ONLY. While the Government is not requesting proposals currently, a draft solicitation and pertinent attachments are attached for review and consideration. Proposed Solicitation Issuance Date: On or around 11/30/2026 with Phase One submittals due within 15 days of issuance.
See the draft solicitation for instructions and evaluation factors for Phase One. This is currently an unfunded requirement with a high expectation that funds will be available. Project Title: NAMA 326209 EAST POTOMAC SEAWALL DESIGN BUILD Description: NPS requires Design-Build (DB) services for the rehabilitation of approximately 20,700 linear feet of shoreline and seawall infrastructure at East Potomac Park in Washington, DC.
Read full notice
The project area includes the shoreline along both the Potomac River and Washington Channel and encompasses associated improvements required to provide long-term shoreline protection, improve drainage performance, preserve public access and protect Park resources.
The Contractor shall develop rehabilitation alternatives for NPS evaluation and approval, and implement solutions that satisfy the following project objectives: * Rehabilitate or replace deteriorated shoreline protection infrastructure; * Restore shoreline functionality and reduce impacts associated with daily tidal cycles, minor storm events, erosion, debris loading, ice forces, and long-term settlement; * Evaluate and establish the appropriate historic functional height for shoreline segments within the Park based on historical documentation, engineering analysis, site conditions, and the NPS objectives; * Evaluate opportunities to accommodate future shoreline adaptation measures consistent with NPS planning objectives; * Reuse and repurpose existing seawall materials where feasible and appropriate; * Maintain drainage and flood recovery performance; * Maintain, restore, and develop continuous public access to include Architectural Barriers Act (ABA)-compliant and universal access circulation routes; * Protect existing utilities and adjacent infrastructure; * Preserve historic, cultural, and environmental resources; * Incorporate sustainable, durable, and low operations and maintenance solutions that minimize future operational burden on the NPS.
Type of Procurement: Two-Phase Design-Build Selection Procedures (FAR 36.101-2 as deviated). The Government anticipates awarding one firm-fixed price contract for the design and construction services required. One solicitation will be issued with the Phase 1 and Phase 2 requirements. A draft solicitation is attached for review and consideration. Estimated Price Range: More than $10,000,000. Estimated Period of Performance: 51 months after award
More open bids like this
-
FWS - Pixley NWR Water Recirculation Design-Build
INTERIOR, DEPARTMENT OF THE -
Y--Mrg Lsari Project Design-Build Contract
INTERIOR, DEPARTMENT OF THE -
Y-- National Cemetery Administration (NCA) Washington Crossing National Cemetery Design/Build Columbarium and In Ground Cremains Project 926CM3009
VETERANS AFFAIRS, DEPARTMENT OF -
RFI USMMA Campus Modernization Program SATOC Seawall Project
DEPT OF DEFENSE -
Mod/Mode/US Bypass Canal Repairs
INTERIOR, DEPARTMENT OF THE