Open bids › Engineering, design and commissioning
RFI USMMA Campus Modernization Program SATOC Seawall Project
DEPT OF DEFENSE
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- Dec 4, 2026 (closes in 11 days)
- Posted
- Nov 12, 2026
- Type
- Sources sought
- Agency
- DEPT OF DEFENSE · DEPT OF THE ARMY
- Place of performance
- NY
- Solicitation number
- W912DS27S0006
- NAICS
- 237990 · Other heavy and civil engineering construction
- PSC
- Y1PZ
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
THIS IS A REQUEST FOR INFORMATION ANNOUNCEMENT ONLYThis announcement is issued solely for market research purposes in accordance with Revolutionary FAR Overhaul (RFO) Part 10, Market Research. The U.S. Army Corps of Engineers (USACE), New York District, is seeking information regarding the interest, capability, and qualifications of firms that may be capable of performing the requirement described below.
This RFI is for planning and informational purposes only. It does not constitute a solicitation, Request for Proposals (RFP), Invitation for Bids (IFB), or commitment by the Government to issue a solicitation or award a contract. Responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract.
The Government will not pay for, reimburse, or otherwise compensate respondents for costs associated with preparing or submitting information in response to this RFI. The Government does not intend to rank submissions or provide individual responses to interested firms. Information submitted and clearly marked as ???????????????????????????Proprietary??????????????????????????? will be handled accordingly.The U.S.
Read full notice
Army Corps of Engineers, New York District is issuing this Request for Information (RFI) for an Indefinite Delivery/Indefinite Quantity, Single Award Task Order Contract (SATOC) to determine interest, capabilities, and qualifications to for Design-Build contractors. The NAICS codes for this procurement is 237990, Size Standard is $45 Million.
The Request for Proposals is planned to be issued in the Spring of 2027 with construction to begin early in 2028. The estimated SATOC capacity is $70,000,000 with the anticipated Task Order magnitude between $10,000,000 and $25,000,000. Work under this contract is expected to begin in winter of 2028.The SATOC will be for contractor to replace/restore 2,800-foot seawall at the United States Merchant Marine Academy, Kings Point, NY.
The project will be constructed within the access-controlled installation along the waterfront of the United States Merchant Marine Academy. Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below:1.
Project Purpose and Program ContextUSACE and USMMA have undertaken an agreement to modernize the campus in its entirety providing upgraded Barracks, Academic Buildings, Training Buildings, Athletic Facilities and Waterfront Spaces. The Seawall will serve to protect critical land side facilities essential to the education and training of Midshipmen from storm, wave action, and tidal erosion.________________________________________2.
Existing Conditions The existing seawall along the United States Merchant Marine Academy (USMMA) campus shoreline extends approximately 2,800 linear feet and is aligned generally north???????????????????????????south along the western waterfront.
The seawall exhibits significant variability in height, construction type and functional purpose along with its length.At the northern end (north of Hague Basin), the shoreline protection system transitions through several construction types in sequence: beginning with a timber (wooden) bulkhead, followed by a stone and mortar wall, then reverting to a timber bulkhead and transitioning to a steel sheet pile bulkhead with a concrete cap.
(See Attachment - USMMA Seawall Site Map)Within the Hague Basin, the shoreline structures consist primarily of steel sheet pile bulkheads and stone fa??????????????????ade walls. Presume the stone fa??????????????????ade walls incorporate a concrete core based on visual assessment.
South of Hague Basin, the shoreline is predominantly stabilized by a concrete seawall with riprap protection, which further transitions to cast-in-place (poured) concrete only toward the southern extent. The southernmost seawall segment, segment 9, includes stabilizing the adjacent slope to address its instability, mitigate…
More open bids like this
-
Industry Day: Chief Joseph Dam Main Unit XJ Breaker Disconnects Modernization
DEPT OF DEFENSE -
Chief Joseph Dam Main Unit XJ Breaker Disconnects Modernization
DEPT OF DEFENSE -
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
DEPT OF DEFENSE -
Lock and Dam 25 New 1,200 Ft Lock Navigation and Ecosystem Sustainability Program (Nesp)
DEPT OF DEFENSE -
Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project
DEPT OF DEFENSE