Open bids › Engineering, design and commissioning
REQUEST FOR INFORMATION (RFI) DDG 1000 Class Modernization: USS Michael Monsoor (DDG 1001) Conventional Prompt Strike (CPS) Depot Modernization Period (DMP); Large Missile Vertical Launch System (LMVLS) Heavy Lift and Industrial Installation
DEPT OF DEFENSE
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- Dec 15, 2026 (closes in 22 days)
- Posted
- Nov 17, 2026
- Type
- Solicitation
- Agency
- DEPT OF DEFENSE · DEPT OF THE NAVY
- Solicitation number
- N00024-27-R-4444
- NAICS
- 336611
- PSC
- J999
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
1.0 PURPOSE & OBJECTIVE PAE Maritime, on behalf of the dPAE Combatants/ DDG 1000 Class Program Office (PMS 500), is conducting market research to assess industry capabilities, engineering rigor, and shipyard infrastructure necessary to accomplish the industrial integration and installation of the Large Missile Vertical Launch System (LMVLS) aboard the USS Michael Monsoor (DDG 1001).
The primary objective of this RFI is to evaluate prospective offerors' specific technical expertise, dry dock/pier-side heavy-lift capabilities, dimensional control methodologies, and integrated production scheduling to execute the installation of a pre-manufactured ~600-ton LMVLS module and associated Conventional Prompt Strike (CPS) warfare alterations.
The questions contained in Section 3.0 are specifically structured to allow industry respondents to demonstrate their understanding of the unique structural, spatial, lifting, and combat systems complexities associated with this depot modernization period.
Read full notice
2.0 TECHNICAL BASELINE & REQUIREMENT SUMMARY Key technical parameters within the DDG 1001 CPS DMP include: 2.1 Ship Particulars Vessel: USS Michael Monsoor (DDG 1001) Length Overall (LOA) / LBP: 186 m (610 ft) / 182.9 m (600 ft) Beam (Maximum): 24.6 m (80.7 ft) Draft (Navigational / DWL): 8.4 m (27.6 ft) / 7.0 m (23.0 ft) Hull Form & Superstructure: Wave-piercing tumblehome hull; steel hull structure with composite deckhouse; integrated power system (IPS).
2.2 LMVLS Pre-Manufactured Assembly Profile (GFM) The Government plans to deliver the LMVLS as Government-Furnished Material (GFM) as a fully out-fitted, pre-manufactured modular block. The industrial effort will require rigging, lifting, transferring, lowering, and setting the ~600-ton LMVLS module into the hull pocket within tight spatial and angular tolerances.
Additional specifications include: Envelope Dimensions: Approximately 44’ 7” Length × 20’ 8” Width × 41’ 1” Height. Total Lift Weight: Approximately 600 Long Tons (LT).
Component Integration: Four (4) launch tubes housing Advanced Payload Modules (APMs) and All-Up Round Canisters (AUR-C), integral shock-isolation foundation assemblies, multi-level bulkheads (down through L5), decks, pre-installed outfitting, and weather deck / 01-level hatch structures. Installation Location: Forward Stack 1400 (reclaimed forward space following MT 61 AGS complete removal).
3.0 TECHNICAL CAPABILITY QUESTIONNAIRE Interested sources are requested to provide detailed technical narrative responses, supported by engineering calculations, facility specifications, past performance references, and risk mitigation methodologies, addressing each section below.
Section A: Heavy Lift, Rigging & Facility Engineering Capabilities Lifting Infrastructure & Capacities: Detail your primary crane assets (gantry, floating, portal, or crawler) capable of hoisting and swinging a 600-ton (approx. 1,344,000 lbs) rigid modular assembly.
Provide the specific crane load charts demonstrating rated capacity at the required operating radius and minimum hook height necessary to clear DDG 1001’s deck edge, bulwarks, and adjacent deckhouse structures (taking into account the 41’ 1” module height plus lifting beam/spreader bar rigging height).
If utilizing a floating crane for the LMVLS, confirm that the selected crane has the clearance to transit under any bridges necessary to arrive at your shipyard.
Specify whether the 600-ton lift will be executed in dry dock or pier-side, and detail the structural load-bearing capacity (pounds per square foot / ground bearing pressure) of the quay wall, pier apron, or dry dock wing walls supporting the crane footprint during maximum outrigger or track loadings.
Rigging, Stability & Tandem Operations: Describe your concept for the lift rigging assembly (spreader frames, equalizing grommets, dynamic load monitoring systems) to eliminate torsional deflection, racking, and localized stress concentrations on the pre-assembled LMVLS module during the…
More open bids like this
-
Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)
DEPT OF DEFENSE -
Request for Information for Request for Qualifications
DEPT OF DEFENSE -
Request for Information
DEPT OF DEFENSE -
PAE Maritime PMS 500 Industry Day Announcement - DDG 1001 Conventional Prompt Strike (CPS) DMP Technical Exchange
DEPT OF DEFENSE -
Request for Information (RFI)-F-15E Inter-Communication Set Control Panel (ICSCP)
DEPT OF DEFENSE