Open bids › Engineering, design and commissioning
Fort McCoy Multipurpose Athletic Field Design-Build-to-Budget
DEPT OF DEFENSE
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- Oct 17, 2026 (closes in 8 days)
- Posted
- Oct 7, 2026
- Type
- Sources sought
- Agency
- DEPT OF DEFENSE · DEPT OF THE ARMY
- Place of performance
- Fort McCoy, WI
- Solicitation number
- W912QR-27-McCoy-MPAF-SS
- NAICS
- 236220 · Nonresidential building construction
- PSC
- Y1FB
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
A Market Survey is being conducted to gather information and feedback from the construction industry to help shape the acquisition strategy for this Design-Build-to-Budget project. The Government is seeking input from all interested business concerns, including Large Businesses, Small Businesses, and certified HUBZone, 8A, Woman-Owned, and Service-Disabled Veteran-Owned Small Businesses. The information gathered will be used to refine the Government's procurement approach for this project delivery method and to determine the potential for a Small Business Set-Aside. If your firm is interested in this project as a prime contractor, please respond appropriately. Project Location: Fort McCoy, WI Project Title: Fort McCoy Multipurpose Athletic Field � Army Combat Fitness Testing Project Description: This project will be solicited as a Design-Build-to-Budget project. The purpose of this solicitation method is to maximize the achievable scope within a target budget ceiling (currently estimated at $14,676,000). The Design-Build to Budget project will consist of a contractual budget ceiling for which contractors will propose the quantities, configurations, construction type and other innovations that the proposing contractor can complete within the budget ceiling. Negotiations will occur with those offerors invited to Phase II to finalize the scope and cost after receipt of initial proposals. The goal is to allow maximum flexibility in design and construction. The Government intends to only include the basic requirements in the RFP. This will be a two (2) phase Design-Build procurement. Fort McCoy has no facility large enough to allow indoor Army�s Holistic Health and Fitness (H2F) system activities or Army Fitness Test (AFT) testing in the winter months or during weather events. Currently outdoor activities are conducted on an existing Physical Training area consisting of an outdoor running track and a hand-to-hand combat training area. Students are required to complete the AFT outdoors in inhospitable conditions or must try to obtain a waiver for this component of their class. The site does not provide protected areas from the elements for the Soldiers during or in-between events. This project will utilize a Design-Build-to-Budget delivery method to design and construct a new facility to contain a 54,600 SF multipurpose athletic field at Fort McCoy, Wisconsin. The facility shall consist of a 200 meter rubberized running track and an artificial turf infield (sized according to Army Techniques Publication (ATP) 7-22.01 Holistic Health and Fitness Training requirements) for completing the annual Army Fitness Testing (AFT). Supporting facilities include site development, modification to existing improvements, utilities and connections, lighting, paving, sidewalks, storm drainage, information systems, landscaping and signage. Consistent temperature control inside the facility shall be provided by self-contained systems. ATFP measures in accordance with the Department of Defense (DoD) Antiterrorism for Buildings will be provided. A life safety analysis of the facility shall be conducted to determine compliance with UFC, IBC, and NFPA codes and standards. A new addressable fire alarm system shall be installed in the facility that is compatible with the existing base fire alarm reporting system. Comprehensive building design services shall be required. Accessibility for individuals with disabilities shall be required. The multipurpose athletic field will be periodically occupied and shall require adequate clearance and circulation for personnel, maintenance and operations. Utility connections and telecommunications system(s) shall be coordinated. The facility shall be designed to a minimum life of 40 years and in accordance with DoD's Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements including energy efficiencies, building envelope, and integrated building systems performance. This is not a c…