Open bids › Engineering, design and commissioning
Rate Intervention and Utility Market Analysis
DEPT OF DEFENSE
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- Nov 20, 2026 (closes in 15 days)
- Posted
- Nov 4, 2026
- Type
- Sources sought
- Agency
- DEPT OF DEFENSE · DEPT OF THE NAVY
- Place of performance
- Washington Navy Yard, DC
- Solicitation number
- PIDXXXX
- NAICS
- 541618 · Management and technical consulting
- PSC
- R408
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
STATEMENT OF WORK for NAVFACSYSCOM Utility Rate Intervention and Utility Market Analysis I. Utility Rate Intervention (C.1 through C.9) C.1 DEFINITIONS The following acronyms or words shall have the corresponding meanings: NAVFACSYSCOM: Naval Facilities Engineering Systems Command, Headquarters FEA: Federal Executive Agencies COTR: Contracting Officer’s Technical Representative SOW: Statement of Work T.O.: Task Order - A task order is a document (DD Form 1155) prepared by the Contracting Officer that is issued to the contractor and unilaterally orders work to be performed. C.2 INTRODUCTION a. The Department of the Navy, Naval Facilities Engineering Systems Command (NAVFACSYSCOM) purchases utility services (electricity, water and natural gas) more than $1 billion annually. NAVFACSYSCOM intervenes in the utility regulatory ratemaking process before various federal, state or local authorities. A major part of NAVFACSYSCOM mission is to protect the Navy’s interests in utility cases, to supply technical support for Navy representation before regulatory bodies, and to participate in regulatory proceedings to ensure that the utility rates are reasonably close to the utility’s cost of providing the service, that they are not unduly discriminatory, and that the rates are just and reasonable. Frequently, NAVFACSYSCOM encounters situations where its participation in the regulatory proceedings concerning utility rate applications is impeded because of manpower, time or specific technical limitations. On occasion, NAVFACSYSCOM contracts professional expertise in certain disciplines in support of its own capabilities. The area in which expert assistance may be required is Cost Allocation and Rate Design. b. Offerors must explicitly state how they can provide the required analysis, testimony, exhibits schedules and work papers or studies within a period not more than thirty calendar days from the date of receiving the assignment and pertinent original case data. Offerors should present in detail their technical and managerial plans for accomplishing such tasks in a timely manner. C.3 SCOPE OF WORK The following tasks are representative of work the contractor may be required to perform. Each task order (T.O.) will include a Statement of Work (SOW) which specifically identifies the requirements of each case. a. Review and analyze the utility’s application including its filing, testimony, exhibits, and other rate case data, work papers, studies, and submit discovery questions, if necessary, as they relate to Cost Allocation and Rate Design. b. Prepare suggested cross-examination questions for all witnesses of adversary parties. c. Prepare testimony and attend hearings if the regulatory authority requires oral presentation of the testimony. If such is required, the Contractor’s witness shall also provide case counsel with technical support. The witness will also be subject to cross-examination by any party to the proceedings. Testimony is to be presented on behalf of the Navy, DOD, and all other FEA’s for consideration by the regulatory authority. d. Provide technical notes for the preparation of legal briefs. e. Analyze orders of the regulatory body and prepare a final report identifying the treatment of the issue presented by the Navy and its resultant cost reduction. C.4 GOVERNMENT FURNISHED PROPERTY None C.5 CONTRACTOR FURNISHED ITEMS The contractor shall provide all equipment, materials, and services to perform the requirements of this contract. C.6 STUDIES AND ANALYSIS REPORTS a. Certain utility issues may require a preliminary analysis report to be performed for a determination to be made as to whether there is a need for intervention or other Navy action. b. The Contractor may, on his own, identify potential issues that can be challenged in testimony, an estimate of the cost savings if the challenged issues are successfully litigated and a commentary regarding the likelihood of success in the challenge of each issue and bring them to th…