Bid Spotter

Open bids › Engineering, design and commissioning

Y--Shasta Powerplant (SH-PP) Compressor Room Modernization

INTERIOR, DEPARTMENT OF THE

Saving is free and needs an account; browsing never does.

Who may bid
Full and open anyone registered may bid
Closes
Nov 19, 2026 (closes in 14 days)
Posted
Nov 4, 2026
Type
Sources sought
Agency
INTERIOR, DEPARTMENT OF THE · DEPARTMENTAL OFFICES
Solicitation number
140RR027R0018
NAICS
237990 · Other heavy and civil engineering construction
PSC
Y1AZ
Source
SAM.gov daily extract (Federal)

Summary from the notice

SOURCES SOUGHT NOTICE (SSN) Shasta Powerplant SH-PP Compressor Room Modernization Department of the Interior (DOI) Bureau of Reclamation (BOR) California–Great Basin Region, Acquisition Office – Sacramento, CA NOTICE TYPE: Sources Sought NAICS: 237990 – Other Heavy and Civil Engineering Construction Size Standard: $45M (average annual receipts) PSC: Y1AZ – Construction of Other Administrative Facilities Construction Project Magnitude: Between $1,000,000 and $2,000,000. Response Due: November 19, 2026, 5:00pm PST THIS IS NOT A SOLICITATION. ________________________________________ 1. PURPOSE OF NOTICE This Sources Sought Notice (SSN) is issued solely for market research and planning purposes in accordance with FAR Part 10. The DOI/BOR is seeking to: A. Allow interested contractors to provide feedback on the information provided. B. Identify qualified and experienced contractors capable of performing the work identified Section 2, Project Overview. C. Identify the best procurement approach based upon the information received (the bullet points below are being provided as examples): o In accordance with RFO Deviation Part 10, and the RFO Companion Guide, the Government should determine if existing agency capabilities can fulfill the need. If the agency does not already have the capability, the next phase of market research can focus on whether other existing federal contract vehicles already offer the products or services needed. For example: ? DOI, Bureau of Indian Affairs (BIA), Construction Multiple Award Contract (C-MAC) ? DOI, Fish and Wildlife Service (FWS) Multiple Award Task Order Contract (MATOC) o Total Small Business Set-Aside o Full and Open Competition ________________________________________ 2. PROJECT OVERVIEW The DOI/BOR is preparing for a potential procurement to completely replace all equipment in the compressor room located at the base of Shasta Dam with modern equipment. Work is located approximately 9 miles northwest of Redding, CA, in Shasta County. The anticipated construction period is 365 calendar days from Notice to Proceed. Principal Components of the Work include, but are not limited to: A. Field Verification: 1. Contractor is responsible for field verification of all existing conditions to ensure new design and components will fit in existing space and function properly. B. Protection of Existing Installations and Temp Air Systems 1. Provide protection for personnel and existing facilities from harm due to Contractor's operations. Protection shall be subject to approval of Government. 2. Contractors shall not operate existing in-use equipment. 3. Arrange protective installations to permit operation of existing equipment and facilities by Government while work is in progress. 4. Do not discharge anything but clear water into building drainage system. 5. Prevent dust from entering ventilating systems. 6. Remove protective installations after purpose has been served. Materials furnished by Contractor to provide protection remain property of Contractor. 7. Repair, at Contractor's expense, damage to existing installations due to Contractor's operations or Contractor's failure to provide proper protection. At Government's option, damage may be repaired by Government, and Contractor will be back charged repair costs. 8. Contractor shall not disturb any asbestos containing materials. Where asbestos containing materials are disturbed for any reason, ________________________________________ 3. ESTIMATED PROCUREMENT SCHEDULE The dates provided below are preliminary and intended to assist contractors with planning. The Government reserves the right to modify these dates at its discretion as circumstances require. Activity Date Issue Pre-Solicitation Notice (if applicable) January 5, 2027 Issue Solicitation January 20, 2027 Quotes/Proposals Due March 1, 2027 Award March 30, 2027 ________________________________________ 4. SYSTEM FOR AWARD MANAGEMENT (SAM) In accordance with RFO Deviation Part 4.203-1(b), “Offeror…

More open bids like this