USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA

DEPT OF DEFENSE

Saving is free and needs an account; browsing never does.

Who may bid
Full and open anyone registered may bid
Closes
Dec 7, 2026 (closes in 59 days)
Posted
Oct 8, 2026
Type
Sources sought
Agency
DEPT OF DEFENSE · DEPT OF THE ARMY
Place of performance
Copperopolis, CA
Solicitation number
W9123827X1CHG
NAICS
237110 · Utility system construction
PSC
Y1PD
Source
SAM.gov daily extract (Federal)

Summary from the notice

This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for the solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for Design-Bid-Build (DBB) construction services to conduct Copper Cove Wastewater Treatment Plant (CCWTP) Improvements in collaboration with the Calaveras County Water District (CCWD) in Calaveras County, California (CA). The project is anticipated to include installation of a new continuous backwash filtration system to replace an existing filter system; electrical improvements to include upgrading the existing PG&E service size to the main switchboard located in the Control Building, installing a new transformer, raceways, metering panel, new Motor Control Center (MCC), and associated wiring and components; interconnection with a pre-existing CCWD-installed suspended air floatation (SAF) filter pretreatment system; installation of a new continuous backwash filter system to include excavation, shoring, and backfill for a partially buried cast-in-place concrete tank with three (3) equipped filter cells (modules), air control panel, grating and handrailing over the filter cells and feed channel; inlet and outlet piping, valves, and connection to existing ultraviolet (UV) inlet piping; and power and control tie-ins. The project is also anticipated to include construction of a new masonry compressor building on a concrete slab foundation, housing a duplex air compressor with space for an additional unit, along with appurtenant equipment on the compressed air piping including a refrigerated air dryer, oil-water separator, and air filter; a new wet well and submersible pump station to include a new buried precast wet well with an adjacent valve vault housing a duplex submersible pump station, valves and appurtenances, piping, and power control conduits constructed adjacent to the new SAF to convey filter backwash waste flow to the SAF. Finally, the project is anticipated to include demolition and disposal of the existing adsorption clarifier and mixed media filter equipment, dewatering of sludge handling facility solids in three (3) containerized, polymer-assisted gravity sludge dewatering systems that will be positioned on a concrete pad with containment walls and drainage systems to capture drained water and return it to Pond 6 through three (3) quick coupler hose connection points (one (1) per bin), and all associated yard pipe modifications to connect the new components to the existing WWTP, generally buried in suitable native or engineered backfill at depths of approximately three (3) to ten (10) feet of cover. The potential requirement may result in a firm-fixed-price construction solicitation issued approximately December 2026. If solicited, the Government intends to award the anticipated requirement by approximately March 2027. The Government estimates that construction of the anticipated requirement can be completed within three-hundred-sixty-five (365) calendar days from Contractor receipt of the Notice to Proceed. Work may also be impacted by bird nesting season, which runs from 1 February through 31 August. If market conditions indicate the estimated period of performance may be unrealistic, Respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The Government currently estimates the target price range for the anticipated project may be between $5,000,000.00 and $10,000,000.00. The North American Industrial Cl…