Bid Spotter

Open bids › Substations, transmission and distribution

Kautz Road Substation Construcion, Uip Subproject 2- Krs

ENERGY, DEPARTMENT OF

Saving is free and needs an account; browsing never does.

Who may bid
Full and open anyone registered may bid
Closes
Dec 18, 2026 (closes in 25 days)
Posted
Nov 5, 2026
Type
Solicitation
Agency
ENERGY, DEPARTMENT OF
Place of performance
Batavia, IL
Solicitation number
RFP-383167-CD
NAICS
237130 · Utility system construction
PSC
Z2MZ
Source
SAM.gov daily extract (Federal)

Summary from the notice

November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements.

It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications.

All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.

Read full notice

The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.

This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.

Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).

Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

More open bids like this

  1. Y--COTP Series Capacitor Two-Phase Design Build

    ENERGY, DEPARTMENT OF
    Full and openCloses Mar 5, 2027Solicitation
  2. 59--Archer Substation Breaker and Switch Replacement

    SAM.gov daily extract
    Total small-business set-asideNo close dateSolicitation
  3. Y--White Horse Hill National Game Preserve Water Main Extension

    INTERIOR, DEPARTMENT OF THE
    Total small-business set-asideCloses in 10 daysPresolicitation
  4. Replace Lift Station 725, PAFB FL

    DEPT OF DEFENSE
    HUBZone set-asideNo close datePresolicitationPATRICK AFB, FL
  5. Electrical Substation Maintenance and Repairs

    DEPT OF DEFENSE
    Total small-business set-asideCloses todayPresolicitationFort Buchanan, PR