Rio De Flag - Phase 4 Construction
DEPT OF DEFENSE
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- Feb 11, 2027 (closes in 80 days)
- Posted
- Nov 19, 2026
- Type
- Presolicitation
- Agency
- DEPT OF DEFENSE · DEPT OF THE ARMY
- Solicitation number
- W912PL27BA001
- NAICS
- 237990 · Other heavy and civil engineering construction
- PSC
- Y1KB
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
SOLICITATION W912PL27BA001: RIO DE FLAG FLOOD CONTROL PROJECT - PHASE 4 CONSTRUCTION (LOWER RDF INLET) PRODUCT SERVICE CODE (PSC): Y1KB - CONSTRUCTION OF CANALSISSUING ACTIVITY: U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) 1. GENERAL PROCUREMENT OVERVIEW: The U.S.
Army Corps of Engineers, Los Angeles District, is issuing this Invitation for Bids (IFB) to award a single, Firm-Fixed-Price (FFP) construction contract for Phase 4 (Lower RDF Inlet) of the Rio De Flag Flood Control Project in Flagstaff, Coconino County, Arizona.- Procurement Type: Invitation for Bids (IFB) conducted pursuant to FAR Part 14 and FAR Part 36 (Sealed Bidding).- Competition: Unrestricted / Full and Open Competition.- Mandatory Classification Code (PSC): Y1KB - Construction of Canals.- NAICS Code: 237990 - Other Heavy and Civil Engineering Construction (Small Business Size Standard: $45.0 Million).- Estimated Construction Magnitude: Between $35,000,000.00 and $50,000,000.00 (FAR 36.204).- Period of Performance: 1,095 calendar days from issuance of Notice to Proceed (NTP), which includes anticipated seasonal winter shutdowns during December and January.- Solicitation Release Date: On or about 4 December 2026.- Public Virtual Bid Opening: On or about 11 February 2027.
2. DETAILED PROJECT SCOPE AND ENGINEERING FEATURES: The Rio De Flag Flood Control Project is a vital flood risk management initiative in partnership with the City of Flagstaff (Non-Federal Sponsor) designed to manage and convey 100-year (1 percent Annual Exceedance Probability [AEP]) flood discharges from Upper Rio De Flag and Clay Avenue Wash through downtown Flagstaff into the Lower Rio De Flag channel.
Read full notice
Phase 4 involves heavy civil, structural, and environmental construction in a dense, historic urban and active railroad corridor. Major components include:- Flood Conveyance Infrastructure: Construction across an adjusted alignment limit of approximately 4,950.58 linear feet (LF), featuring: -- 1,995 LF of Reinforced Concrete Box (RCB) culverts (single and multiple-barrel sections).
-- 2,555.08 LF of riprap-lined earthen trapezoidal channel (9-inch and 21-inch stone revetment). -- 200 LF of grouted stone channel, 100.5 LF of reinforced concrete transition structures, and 100 LF of rectangular concrete channel. -- Concrete wingwalls, drop inlets, junction structures, side drainage connections (18-inch to 60-inch RCP), and outlet headwalls.- Earthwork and Controlled Rock Blasting: Mass soil excavation (approx.
85,000 plus CY), soft rock excavation (approx. 27,000 plus CY), and hard basalt rock excavation (approx. 21,000 plus CY). Hard rock excavation requires precision line drilling, specialized shoring, and controlled blasting under stringent vibration thresholds.- Active Railway Corridor Coordination: Culvert construction occurs within 15 feet of active Burlington Northern Santa Fe (BNSF) Railway mainline tracks and historic downtown structures.
Real-time automated geotechnical monitoring (vibration/PPV, tiltmeters, ground settlement, inclinometers, and piezometers) and strict compliance with a mandatory BNSF License Agreement are required.
Work also includes relocation of the San Francisco Street BNSF signal bungalow.- Environmental Remediation: Excavation, testing, handling, and off-site disposal of petroleum-contaminated soils, and decommissioning/removal of underground storage tanks (USTs) in historic downtown locations (including former Paramount, Fuel Bunkers, Creosote, and 5 Points sites).- Civil and Utility Support: Surface water diversion and control, complex groundwater dewatering (water tables 5 to 20 feet below pre-excavation surface), extensive City of Flagstaff utility relocations (water, sanitary sewer, storm drainage), street restoration, traffic control, security fencing, automated irrigation systems, exterior plantings, and a mandatory 12-month plant establishment period.
3. SUMMARY OF IFB / SEALED BIDDING PROCEDURES:- Unit Price CLIN Schedule: Bids must…
More open bids like this
-
Department of Energy, AT Courtyard Construction and Site Utility Infrastructure
DEPT OF DEFENSE -
Dredged Material Containment Area (DMCA) O&M Construction IDC
DEPT OF DEFENSE -
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
DEPT OF DEFENSE -
Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois
DEPT OF DEFENSE -
USACE SPK DBB Construction - LAR C3B North - Sacramento, CA
DEPT OF DEFENSE