Barkley ES Stairwells Replacement
DEPT OF DEFENSE
Saving is free and needs an account; browsing never does.
- Who may bid
- Full and open anyone registered may bid
- Closes
- Nov 30, 2026 (closes in 7 days)
- Posted
- Nov 17, 2026
- Type
- Sources sought
- Agency
- DEPT OF DEFENSE · DEPT OF THE ARMY
- Place of performance
- Fort Campbell, KY
- Solicitation number
- W912QR27BESSR
- NAICS
- 238190
- PSC
- C1CA
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
Construction of the Barkley Elementary School Stairwells Replacement at Fort Campbell, KY. A market survey is being conducted to determine if there are a reasonable number of interested business concerns to determine any future set-asides for this project.
If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business, Service-Disabled Veteran Owned Small Business, or Large Business and you are interested in this project please respond appropriately. The intent of this future solicitation will be to select one contractor for the design-bid-build construction of the Barkley Elementary School Stairwells Replacement at Fort Campbell, KY.
Project Location: Fort Campbell, KY 37042 Project Description: Construction of four (4) 357 square foot exterior stairwells totaling 1,428 Square Feet at Barkley Elementary School at Ft. Campbell, KY. Barkley Elementary School has four exterior stairwells that have been damaged by snow removal salt. These stairwells are painted steel beams and steel pans (pans are concrete filled steps), that have rust damage.
Read full notice
A recent project to sandblast and epoxy paint the steel portions of the stairwells was unsuccessful; severe rusting and degradation of the steel stairwells continued after the next salt placement for snow removal. Contract duration is estimated at 180 calendar days. In accordance with FAR 36.204, the estimated cost range is $500,000.00-$1,000,000.
The NAICS code is 238190 - Other Foundation, Structure, and Building Exterior Contractors with a Size Standard of $19M. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses, and Service-Disabled Veteran Owned Small Business contractors should respond to this survey via the Microsoft Forms link NLT 30 November 2026 by 11:00 AM Eastern Time. This project will be solicitated as a single-phase design-bid-build project.
Responses should include: 1. Identification and verification of the company’s small business status. 2. Contractor’s Unique Identifier Number and CAGE Code(s). 3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 4.
Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with greater than 95 percent completion or projects completed in the past five (5) years in which the interested firm served as the prime contractor. Example projects must be of similar size and scope to be considered.
Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference that may be contacted to verify project size, scope, dollar value, self-performance percentage, percent complete, and quality of performance.. a.
Projects considered similar in scope to this project would include Steel fabrication and erection above single-story height or similar exterior stairwell replacement or new installation. b. Projects considered similar in size to this project would include: Steel Fabrication over 800 sq. ft.. c. Based on the information above, for each project submitted, include: 1.
Current percentage of construction complete and the date when it was or will be completed. 2. Scope of the project. 3. Size of the project. 5. The dollar value of the construction contract and whether it was design-bid build, design-build or design-build to budget. 6. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. 7.
Identify the number of subcontractors by construction trade utilized for each project. 8. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 9.
Small Businesses are reminded under RFO 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement…
More open bids like this
-
Switchgear Transformer Replacement
DEPT OF DEFENSE -
Chesapeake and Delaware (C and D) Canal Building Replacement Project.
DEPT OF DEFENSE -
Y--P-440 Replacement of Naval Pier 8, Naval Base San Diego, San Diego, Ca
DEPT OF DEFENSE -
Steam Turbine Generator Governor System Replacement
DEPT OF DEFENSE -
Tenkiller 15KV Switchgear and Station Service Replacement
DEPT OF DEFENSE