Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGB
DEPT OF DEFENSE
Saving is free and needs an account; browsing never does.
- Who may bid
- Total small-business set-aside a certification is required to bid
- Closes
- Nov 11, 2026 (closes in 33 days)
- Posted
- Sep 29, 2026
- Type
- Solicitation
- Agency
- DEPT OF DEFENSE · DEPT OF THE ARMY
- Solicitation number
- W50S8X26BA011
- NAICS
- 236220 · Nonresidential building construction
- PSC
- Y1AZ
- Source
- SAM.gov daily extract (Federal)
Summary from the notice
The Contractor shall provide non-personal services, to include all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) simulator facility at Moffett Air National Guard Base (ANGB), Mountain View, California. This project will provide an approximately 8,202 gross square foot building consisting of a multi-story, high bay area to house the CRH-OFT simulator, with a single-story area containing CRH mission planning, briefing and debriefing rooms, administrative areas for training and support staff, OFT maintenance and parts storage rooms, secure and non-secure telecommunication rooms, latrine facilities and mechanical, electrical and utility support rooms utilizing conventional design and construction. The building will be of permanent construction with electrical, mechanical, HVAC, plumbing, wet sprinkler fire suppression, fire detection, access control, direct digital control, and utility management. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Air space and insulation to be located inside the cavity wall to meet Energy Code requirements. The primary roofing materials will be standing seam metal roofing to match other installation facilities and the perimeter sloped roof design will include a prefinished standing seam metal roof panel system over rigid insulation. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Main entrance doors will be a pair of anodized aluminum storefront entrance doors with insulating glass including a sidelight. The Mechanical, Electrical, Sim Bay and secondary egress doors will be painted, insulated hollow metal door and frames with controlled access. Antiterrorism/Force Protection elements are incorporated. Supporting facilities include landscaping, utilities, pavements, storm drainage, sanitary sewer, site improvements, communications support, cybersecurity control systems, and tempest security.