Bid Spotter

Open bids › Engineering, design and commissioning

Groundwater Monitoring in Wabasha County, MN

DEPT OF DEFENSE

Saving is free and needs an account; browsing never does.

Who may bid
Total small-business set-aside a certification is required to bid
Closes
Nov 18, 2026 (closes in 13 days)
Posted
Nov 3, 2026
Type
Solicitation
Agency
DEPT OF DEFENSE · DEPT OF THE ARMY
Solicitation number
W912ES27QA013
NAICS
541380 · Engineering and architectural services
PSC
F103
Source
SAM.gov daily extract (Federal)

Summary from the notice

The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.

More open bids like this